GOVERNMENT CONTRACT / DELIVERY ORDER
MOD TO ADD FUNDING TO ACCOUNT FOR ADDITIONAL DAMAGE THAT WAS IDENTIFIED WITHIN THE MOTOR ASSEMBLY, REQUIRING REPAIRS TO THE DRIVE-SIDE SNOUT, MACHINING OF TWO AREAS OF THE SHAFT, A
Awarded to CAPITAL BRAND GROUP LLC
- Company legal name
- CAPITAL BRAND GROUP LLC
- UEI / CAGE
- DV9FJK9Y3MD3 / Not reported
- Parent award
- Not reported
- Awarding agency
- General Services Administration
- Subagency
- Public Buildings Service
- Industry
- Other
- NAICS
- 561210
- PSC
- Z1AZ
- Performance period
- Not reported — Not reported
- Recipient address
- 12501 PROSPERITY DR, SILVER SPRING, MONTGOMERY, MD, 20904
- Place of performance
- WASHINGTON, DISTRICT OF COLUMBIA, DC, 20407
- Source last modified
- Oct 23, 2026
Description
MOD TO ADD FUNDING TO ACCOUNT FOR ADDITIONAL DAMAGE THAT WAS IDENTIFIED WITHIN THE MOTOR ASSEMBLY, REQUIRING REPAIRS TO THE DRIVE-SIDE SNOUT, MACHINING OF TWO AREAS OF THE SHAFT, AND REPAIR OF THE KEYWAY.
Derived from official transactions
Contract lifecycle
- Award announced
MOD TO ADD FUNDING TO ACCOUNT FOR ADDITIONAL DAMAGE THAT WAS IDENTIFIED WITHIN THE MOTOR ASSEMBLY, REQUIRING REPAIRS TO THE DRIVE-SIDE SNOUT, MACHINING OF TWO AREAS OF THE SHAFT, A
- Contract modified
MOD TO ADD FUNDING TO ACCOUNT FOR ADDITIONAL DAMAGE THAT WAS IDENTIFIED WITHIN THE MOTOR ASSEMBLY, REQUIRING REPAIRS TO THE DRIVE-SIDE SNOUT, MACHINING OF TWO AREAS OF THE SHAFT, A
- Value increased
MOD TO ADD FUNDING TO ACCOUNT FOR ADDITIONAL DAMAGE THAT WAS IDENTIFIED WITHIN THE MOTOR ASSEMBLY, REQUIRING REPAIRS TO THE DRIVE-SIDE SNOUT, MACHINING OF TWO AREAS OF THE SHAFT, A
Point-in-time model
Contract change outlook
Uncollapsed source history
Transactions and modifications
| Action date | Modification | Action type | Exact obligation | Current total | Potential total | Description | Source |
|---|---|---|---|---|---|---|---|
| Oct 16, 2026 | PS0001 | B | $4,757.28 | Not reported | Not reported | MOD TO ADD FUNDING TO ACCOUNT FOR ADDITIONAL DAMAGE THAT WAS IDENTIFIED WITHIN THE MOTOR ASSEMBLY, REQUIRING REPAIRS TO THE DRIVE-SIDE SNOUT, MACHINING OF TWO AREAS OF THE SHAFT, AND REPAIR OF THE KEYWAY. | USAspending ↗ |