DEFINITIVE CONTRACT

NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES THE FUNDING AMOUNT OF $599,000 AND UPDATES THE FUNDING THROUGH DATE

Awarded to SPACE EXPLORATION TECHNOLOGIES CORP.

PIID 80KSC021CA006US · USAspendingSpace & Satellite
$125.1M
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligation$125,075,111sum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateJul 23, 2021
Company legal name
SPACE EXPLORATION TECHNOLOGIES CORP.
UEI / CAGE
C6M7C2FLKER5 / Not reported
Parent award
Not reported
Awarding agency
National Aeronautics and Space Administration
Subagency
National Aeronautics and Space Administration
Industry
Space & Satellite
NAICS
336414
PSC
AR12
Performance period
Not reported — Not reported
Recipient address
1 ROCKET RD, HAWTHORNE, LOS ANGELES, CA, 90250
Place of performance
HAWTHORNE, LOS ANGELES, CA, 90250
Source last modified
Nov 3, 2026

Description

NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES THE FUNDING AMOUNT OF $599,000 AND UPDATES THE FUNDING THROUGH DATE

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATES TO THE MISSION SOLUTION, ADD INCREMENTAL FUND

    US · usaspendingSource ↗
  2. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATES TO THE MISSION SOLUTION, ADD INCREMENTAL FUND

    US · usaspending$3.2MSource ↗
  3. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $7,100,000 AND UPDATE FUNDED-THROUGH DATE TO 20 MARCH 2024.

    US · usaspendingSource ↗
  4. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $7,100,000 AND UPDATE FUNDED-THROUGH DATE TO 20 MARCH 2024.

    US · usaspending$7.1MSource ↗
  5. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,108,851 AND UPDATE FUNDED-THROUGH DATE TO 18 JANUARY 2024.

    US · usaspendingSource ↗
  6. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,108,851 AND UPDATE FUNDED-THROUGH DATE TO 18 JANUARY 2024.

    US · usaspending$2.1MSource ↗
  7. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $288,614. EXCEPT AS PROVIDED HEREIN ALL OTHER TERMS AND CONDITI

    US · usaspendingSource ↗
  8. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $288,614. EXCEPT AS PROVIDED HEREIN ALL OTHER TERMS AND CONDITI

    US · usaspending$288.6KSource ↗
  9. Contract modified

    EUROPA CLIPPER MISSION. ADD SOFTWARE LOCKDOWN LANGUAGE TO CONTRACT TERMS AND CONDITIONS AND UPDATE CONTRACT DATA REQUIREMENTS LIST.

    US · usaspendingSource ↗
  10. Contract modified

    EUROPA CLIPPER MISSION. INCORPORATE UPDATED WORK PLAN AND MISSION SOLUTION.

    US · usaspendingSource ↗
  11. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES MISSION UNIQUE SERVICES 15, IMPLEMENTATION OF BATTERY DISCHARGE INTERRUPT SWITCH IN THE AMOU

    US · usaspendingSource ↗
  12. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES MISSION UNIQUE SERVICES 15, IMPLEMENTATION OF BATTERY DISCHARGE INTERRUPT SWITCH IN THE AMOU

    US · usaspending$10.5MSource ↗
  13. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). REMOVE COVID CLAUSE (CLAUSE 41.0) PER AGENCY GUIDANCE. ADD INCREMENTAL FUNDING.

    US · usaspendingSource ↗
  14. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). REMOVE COVID CLAUSE (CLAUSE 41.0) PER AGENCY GUIDANCE. ADD INCREMENTAL FUNDING.

    US · usaspending$11.6MSource ↗
  15. Contract modified

    EUROPA CLIPPER LAUNCH SERVICE MOD 24: INCORPORATE MISSION UNIQUE SERVICES (MUS) 14- LIQUID OXYGEN (LOX) UPGRADE ON CONTRACT.

    US · usaspendingSource ↗
  16. Value increased

    EUROPA CLIPPER LAUNCH SERVICE MOD 24: INCORPORATE MISSION UNIQUE SERVICES (MUS) 14- LIQUID OXYGEN (LOX) UPGRADE ON CONTRACT.

    US · usaspending$14MSource ↗
  17. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 23: INCORPORATE MISSION UNIQUE SERVICES

    US · usaspendingSource ↗
  18. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES $1,400,000 TO $76,340,690.12 AND UPDATES THE FUNDING THROUGH DATE.

    US · usaspendingSource ↗
  19. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES $1,400,000 TO $76,340,690.12 AND UPDATES THE FUNDING THROUGH DATE.

    US · usaspending$1.4MSource ↗
  20. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES THE FUNDING AMOUNT OF $599,000 AND UPDATES THE FUNDING THROUGH DATE

    US · usaspendingSource ↗
  21. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES THE FUNDING AMOUNT OF $599,000 AND UPDATES THE FUNDING THROUGH DATE

    US · usaspending$599KSource ↗
  22. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 20: REVISE ATTACHMENT D8-WORK PLAN AND UPDATE THE FUNDING THROUGH DATE.

    US · usaspendingSource ↗
  23. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE SUM AVAILABLE FOR PAYMENT AND ALLOTTED TO THIS CONTRACT IS DECREASED BY $309.88. EXCEPT AS PROVIDED

    US · usaspendingSource ↗
  24. Value decreased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE SUM AVAILABLE FOR PAYMENT AND ALLOTTED TO THIS CONTRACT IS DECREASED BY $309.88. EXCEPT AS PROVIDED

    US · usaspending-$309.9Source ↗
  25. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). DESCOPE MISSION UNIQUE SERVICE (MUS) 1, MISSION-SPECIFIC MULTI-DOOR PAYLOAD FAIRING.

    US · usaspendingSource ↗
  26. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT FUNDING INCREASED $13,300,000 TO $74,342,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPORAT

    US · usaspendingSource ↗
  27. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT FUNDING INCREASED $13,300,000 TO $74,342,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPORAT

    US · usaspending$13.3MSource ↗
  28. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT FUNDING INCREASED $998,000.00 TO $61,042,000.00. CONTRACT CHANGE PAGE PROVIDED AND INCORP

    US · usaspendingSource ↗
  29. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT FUNDING INCREASED $998,000.00 TO $61,042,000.00. CONTRACT CHANGE PAGE PROVIDED AND INCORP

    US · usaspending$998KSource ↗
  30. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT AMOUNT DECREASED $1,000,000.00 TO $60,044,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPOR

    US · usaspendingSource ↗
  31. Value decreased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT AMOUNT DECREASED $1,000,000.00 TO $60,044,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPOR

    US · usaspending-$1MSource ↗
  32. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). PROVIDES FUNDING, TOTAL CONTRACT AMOUNT INCREASED $10,706,300 TO $61,044,000. CONTRACT CHANGE PAGE PROVID

    US · usaspendingSource ↗
  33. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). PROVIDES FUNDING, TOTAL CONTRACT AMOUNT INCREASED $10,706,300 TO $61,044,000. CONTRACT CHANGE PAGE PROVID

    US · usaspending$10.7MSource ↗
  34. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES MISSION UNIQUE SERVICE 12. TOTAL CONTRACT AMOUNT INCREASED $2,242,640 TO $181,297,182. CONTR

    US · usaspendingSource ↗
  35. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING INCREASED $8,807,700 TO $50,337,700. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.

    US · usaspendingSource ↗
  36. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING INCREASED $8,807,700 TO $50,337,700. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.

    US · usaspending$8.8MSource ↗
  37. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). UPDATE TO SECTION B, TABLE B-1. CONTRACT CHANGE PAGES ARE PROVIDED AND INCORPORATED HEREIN.

    US · usaspendingSource ↗
  38. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING IS INCREASE $732,346. CONTRACT CHANGE PAGES ARE PROVIDED AND INCORPORATED HEREIN. TOTAL CONTRACT

    US · usaspendingSource ↗
  39. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING IS INCREASE $7,931,671. CONTRACT CHANGE PAGE C-1 IS PROVIDED AND INCORPORATED HEREIN. ALL OTHER T

    US · usaspendingSource ↗
  40. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING IS INCREASE $7,931,671. CONTRACT CHANGE PAGE C-1 IS PROVIDED AND INCORPORATED HEREIN. ALL OTHER T

    US · usaspending$7.9MSource ↗
  41. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 8: PROVIDES INCREMENTAL FUNDING TO CONTRACT LINE ITEM NUMBER (CLIN)1.

    US · usaspendingSource ↗
  42. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 8: PROVIDES INCREMENTAL FUNDING TO CONTRACT LINE ITEM NUMBER (CLIN)1.

    US · usaspending$6.9MSource ↗
  43. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADDS INCREMENTAL FUNDING, CONTRACT CHANGE PAGE C-11 IS PROVIDED AND INCORPORATED HEREIN.

    US · usaspendingSource ↗
  44. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADDS INCREMENTAL FUNDING, CONTRACT CHANGE PAGE C-11 IS PROVIDED AND INCORPORATED HEREIN.

    US · usaspending$2.2MSource ↗
  45. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE SUM AVAILABLE FOR PAYMENT AND ALLOTTED TO THIS CONTRACT IS INCREASED BY $8,100,000 TO $24,580,000. C

    US · usaspendingSource ↗
  46. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE SUM AVAILABLE FOR PAYMENT AND ALLOTTED TO THIS CONTRACT IS INCREASED BY $8,100,000 TO $24,580,000. C

    US · usaspending$8.1MSource ↗
  47. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 5: SECTION C, CLAUSE 6.0 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989) SUM A

    US · usaspendingSource ↗
  48. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 5: SECTION C, CLAUSE 6.0 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989) SUM A

    US · usaspending$1.5MSource ↗
  49. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). REVISE ATTACHMENT D8, EUROPA CLIPPER WORK PLAN. UPDATE THE PERFORMANCE WORK STATEMENT (PWS), AND UPDATE

    US · usaspendingSource ↗
  50. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATE CLAUSE NFS CLAUSE 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY

    US · usaspendingSource ↗
  51. Contract modified

    E14042: NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRA

    US · usaspendingSource ↗
  52. Award announced

    EUROPA CLIPPER LAUNCH SERVICE

    US · usaspendingSource ↗
  53. Contract modified

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. THE FOLLOWING CONTRACT CHANGE PAGE(S) IS PROVIDED AND I

    US · usaspendingSource ↗
  54. Value increased

    NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. THE FOLLOWING CONTRACT CHANGE PAGE(S) IS PROVIDED AND I

    US · usaspending$1MSource ↗
  55. Value increased

    EUROPA CLIPPER LAUNCH SERVICE

    US · usaspending$14MSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Feb 23, 2024P00032M$3,184,956.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATES TO THE MISSION SOLUTION, ADD INCREMENTAL FUNDING, AND ADJUST THE FUNDED-THROUGH DATE ACCORDINGLY.USAspending ↗
Jan 11, 2024P00031C$7,100,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $7,100,000 AND UPDATE FUNDED-THROUGH DATE TO 20 MARCH 2024.USAspending ↗
Nov 8, 2023P00030C$2,108,850.59Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $2,108,851 AND UPDATE FUNDED-THROUGH DATE TO 18 JANUARY 2024.USAspending ↗
Sep 20, 2023P00029C$288,613.99Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADD INCREMENTAL FUNDING IN THE AMOUNT OF $288,614. EXCEPT AS PROVIDED HEREIN ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.USAspending ↗
Sep 8, 2023P00028MNot reportedNot reportedNot reportedEUROPA CLIPPER MISSION. ADD SOFTWARE LOCKDOWN LANGUAGE TO CONTRACT TERMS AND CONDITIONS AND UPDATE CONTRACT DATA REQUIREMENTS LIST.USAspending ↗
Aug 9, 2023P00027MNot reportedNot reportedNot reportedEUROPA CLIPPER MISSION. INCORPORATE UPDATED WORK PLAN AND MISSION SOLUTION.USAspending ↗
Apr 10, 2023P00025B$10,451,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES MISSION UNIQUE SERVICES 15, IMPLEMENTATION OF BATTERY DISCHARGE INTERRUPT SWITCH IN THE AMOUNT OF $250,564 AND ADDS INCREMENTAL FUNDING OF $10,451,000.USAspending ↗
Apr 10, 2023P00026M$11,601,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). REMOVE COVID CLAUSE (CLAUSE 41.0) PER AGENCY GUIDANCE. ADD INCREMENTAL FUNDING.USAspending ↗
Feb 16, 2023P00024B$14,000,000.00Not reportedNot reportedEUROPA CLIPPER LAUNCH SERVICE MOD 24: INCORPORATE MISSION UNIQUE SERVICES (MUS) 14- LIQUID OXYGEN (LOX) UPGRADE ON CONTRACT.USAspending ↗
Jan 26, 2023P00023BNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 23: INCORPORATE MISSION UNIQUE SERVICESUSAspending ↗
Jan 18, 2023P00022C$1,400,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES $1,400,000 TO $76,340,690.12 AND UPDATES THE FUNDING THROUGH DATE.USAspending ↗
Dec 14, 2022P00021C$599,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). OBLIGATES THE FUNDING AMOUNT OF $599,000 AND UPDATES THE FUNDING THROUGH DATEUSAspending ↗
Dec 7, 2022P00020BNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 20: REVISE ATTACHMENT D8-WORK PLAN AND UPDATE THE FUNDING THROUGH DATE.USAspending ↗
Oct 20, 2022P00018C-$309.88Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE SUM AVAILABLE FOR PAYMENT AND ALLOTTED TO THIS CONTRACT IS DECREASED BY $309.88. EXCEPT AS PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.USAspending ↗
Oct 20, 2022P00019BNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). DESCOPE MISSION UNIQUE SERVICE (MUS) 1, MISSION-SPECIFIC MULTI-DOOR PAYLOAD FAIRING.USAspending ↗
Oct 17, 2022P00017C$13,300,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT FUNDING INCREASED $13,300,000 TO $74,342,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Sep 28, 2022P00016C$998,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT FUNDING INCREASED $998,000.00 TO $61,042,000.00. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Aug 29, 2022P00015C-$1,000,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). TOTAL CONTRACT AMOUNT DECREASED $1,000,000.00 TO $60,044,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Aug 24, 2022P00014C$10,706,300.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). PROVIDES FUNDING, TOTAL CONTRACT AMOUNT INCREASED $10,706,300 TO $61,044,000. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Aug 2, 2022P00013BNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES MISSION UNIQUE SERVICE 12. TOTAL CONTRACT AMOUNT INCREASED $2,242,640 TO $181,297,182. CONTRACT CHANGE PAGES ARE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Jun 22, 2022P00012C$8,807,700.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING INCREASED $8,807,700 TO $50,337,700. CONTRACT CHANGE PAGE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Jun 6, 2022P00011BNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). UPDATE TO SECTION B, TABLE B-1. CONTRACT CHANGE PAGES ARE PROVIDED AND INCORPORATED HEREIN.USAspending ↗
May 17, 2022P00009C$7,931,671.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING IS INCREASE $7,931,671. CONTRACT CHANGE PAGE C-1 IS PROVIDED AND INCORPORATED HEREIN. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.USAspending ↗
May 17, 2022P00010BNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). FUNDING IS INCREASE $732,346. CONTRACT CHANGE PAGES ARE PROVIDED AND INCORPORATED HEREIN. TOTAL CONTRACT AMOUNT INCREASED FROM $178,322,196 TO $179,054,542.USAspending ↗
Apr 6, 2022P00008C$6,850,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 8: PROVIDES INCREMENTAL FUNDING TO CONTRACT LINE ITEM NUMBER (CLIN)1.USAspending ↗
Mar 14, 2022P00007C$2,168,329.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). ADDS INCREMENTAL FUNDING, CONTRACT CHANGE PAGE C-11 IS PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Jan 12, 2022P00006M$8,100,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THE SUM AVAILABLE FOR PAYMENT AND ALLOTTED TO THIS CONTRACT IS INCREASED BY $8,100,000 TO $24,580,000. CONTRACT CHANGE PAGE C-11 IS PROVIDED AND INCORPORATED HEREIN.USAspending ↗
Dec 13, 2021P00005C$1,480,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). MOD 5: SECTION C, CLAUSE 6.0 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR 1989) SUM AVAILABLE FOR PAYMENT AND ALLOTTED IS INCREASED.USAspending ↗
Dec 13, 2021P00004MNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). REVISE ATTACHMENT D8, EUROPA CLIPPER WORK PLAN. UPDATE THE PERFORMANCE WORK STATEMENT (PWS), AND UPDATE THE MISSION SOLUTION PWS EXHIBIT 9.USAspending ↗
Nov 4, 2021P00003MNot reportedNot reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATE CLAUSE NFS CLAUSE 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED INFORMATION TECHNOLOGY RESOURCES (DEVIATION 21-01)USAspending ↗
Oct 13, 2021P00002MNot reportedNot reportedNot reportedE14042: NASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). INCORPORATES FAR CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS. (DEVIATION 21-03)USAspending ↗
Jul 23, 2021P00001M$1,000,000.00Not reportedNot reportedNASA LAUNCH SERVICES II - SPACE EXPLORATION TECHNOLOGIES (EUROPA CLIPPER). THIS MODIFICATION IS TO ADD INCREMENTAL FUNDING. THE FOLLOWING CONTRACT CHANGE PAGE(S) IS PROVIDED AND INCORPORATED HEREIN: SECTION C: PAGE C-11USAspending ↗
Jul 23, 20210Not reported$14,000,000.00Not reportedNot reportedEUROPA CLIPPER LAUNCH SERVICEUSAspending ↗