GOVERNMENT CONTRACT / DEFINITIVE CONTRACT

THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

Awarded to LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC

PIID NNG11FC20CUS · USAspendingOther
$302.7M
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligation$302,737,522sum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateJul 1, 2011
Company legal name
LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC
UEI / CAGE
MLZQLK2GQDW7 / Not reported
Parent award
Not reported
Awarding agency
National Aeronautics and Space Administration
Subagency
National Aeronautics and Space Administration
Industry
Other
NAICS
541330
PSC
R699
Performance period
Not reported — Not reported
Recipient address
7474 GREENWAY CENTER DR, GREENBELT, PRINCE GEORGE'S, MD, 20770
Place of performance
GREENBELT, PRINCE GEORGES, MD, 20771
Source last modified
Nov 3, 2026

Description

THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  2. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$2.6MSource ↗
  3. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$3MSource ↗
  4. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  5. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  6. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$742.9KSource ↗
  7. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  8. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  9. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$16MSource ↗
  10. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  11. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$5MSource ↗
  12. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  13. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$402.1KSource ↗
  14. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  15. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$14.2MSource ↗
  16. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  17. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$3.5MSource ↗
  18. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  19. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$3.5MSource ↗
  20. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  21. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$3.5MSource ↗
  22. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  23. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$1.3MSource ↗
  24. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  25. Contract modified

    EO14042 THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE O

    US · usaspendingSource ↗
  26. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  27. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  28. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$4MSource ↗
  29. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$2.2MSource ↗
  30. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  31. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  32. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$2MSource ↗
  33. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  34. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$4.2MSource ↗
  35. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  36. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$4.1MSource ↗
  37. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  38. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$366KSource ↗
  39. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  40. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$4.5MSource ↗
  41. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  42. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  43. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$4.4MSource ↗
  44. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$3MSource ↗
  45. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  46. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$464KSource ↗
  47. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  48. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$6MSource ↗
  49. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  50. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  51. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$2.5MSource ↗
  52. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$7.3MSource ↗
  53. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  54. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$6.1MSource ↗
  55. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  56. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$5MSource ↗
  57. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  58. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$928KSource ↗
  59. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  60. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  61. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$5MSource ↗
  62. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  63. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$4MSource ↗
  64. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  65. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  66. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$264KSource ↗
  67. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$996KSource ↗
  68. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  69. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$455KSource ↗
  70. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  71. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  72. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$6MSource ↗
  73. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  74. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$5.1MSource ↗
  75. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  76. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$5.5MSource ↗
  77. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  78. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$9.1MSource ↗
  79. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  80. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$5MSource ↗
  81. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  82. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  83. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$2.5MSource ↗
  84. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  85. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$550KSource ↗
  86. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  87. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  88. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$2.1MSource ↗
  89. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  90. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  91. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$3MSource ↗
  92. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  93. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  94. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending$250KSource ↗
  95. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  96. Value decreased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspending-$20.8KSource ↗
  97. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS F

    US · usaspendingSource ↗
  98. Value increased

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS

    US · usaspending$10.7MSource ↗
  99. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS

    US · usaspendingSource ↗
  100. Contract modified

    THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS

    US · usaspendingSource ↗
  101. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$4MSource ↗
  102. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  103. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$1.5MSource ↗
  104. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  105. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$761KSource ↗
  106. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  107. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$1.3MSource ↗
  108. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  109. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$4.7MSource ↗
  110. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  111. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$202.7KSource ↗
  112. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  113. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  114. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$2MSource ↗
  115. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  116. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$3.3KSource ↗
  117. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  118. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  119. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$6.7MSource ↗
  120. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$12.1MSource ↗
  121. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  122. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$700KSource ↗
  123. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  124. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$2.3MSource ↗
  125. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  126. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$2.9MSource ↗
  127. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  128. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  129. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  130. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$400KSource ↗
  131. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  132. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  133. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$132.3KSource ↗
  134. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  135. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$2.9MSource ↗
  136. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  137. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$8MSource ↗
  138. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  139. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$7.9MSource ↗
  140. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  141. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  142. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$5.8MSource ↗
  143. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  144. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  145. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$5.1MSource ↗
  146. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  147. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  148. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$7MSource ↗
  149. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  150. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$2.3MSource ↗
  151. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  152. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$4.7MSource ↗
  153. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  154. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  155. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$3.5MSource ↗
  156. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$1.3MSource ↗
  157. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  158. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$8.5MSource ↗
  159. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  160. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  161. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$215.5KSource ↗
  162. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  163. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$2.4MSource ↗
  164. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  165. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$1.6MSource ↗
  166. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$3MSource ↗
  167. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  168. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  169. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  170. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$14MSource ↗
  171. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  172. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  173. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$4.5MSource ↗
  174. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  175. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$3MSource ↗
  176. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  177. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$1.1MSource ↗
  178. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  179. Value increased

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspending$5MSource ↗
  180. Award announced

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗
  181. Contract modified

    THE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOP

    US · usaspendingSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Feb 15, 2024101C$2,615,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 20, 2023100C$3,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 22, 202399C$742,912.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 24, 202398MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 2, 202397C$16,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 14, 202396VNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 26, 202295C$5,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 16, 202294C$402,139.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 29, 202293C$14,172,193.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 9, 202292C$3,500,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 16, 202191A$3,500,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 19, 202190B$3,500,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 28, 202189B$1,300,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 15, 202188MNot reportedNot reportedNot reportedEO14042 THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 11, 202187BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 24, 202186B$4,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 16, 202185B$2,177,116.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 22, 202184B$2,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 27, 202183BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 24, 202182C$4,209,715.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 17, 202081C$4,055,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 18, 202080C$366,048.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 10, 202079C$4,500,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 12, 202078C$4,367,400.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 19, 202077C$3,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 14, 202076C$464,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 12, 202075C$6,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 19, 201974C$2,467,125.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 29, 201973C$7,331,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 5, 201972C$6,140,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 12, 201971C$5,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 13, 201970C$928,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 31, 201969C$5,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 20, 201868BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 14, 201867C$4,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 19, 201866C$264,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 29, 201865C$996,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 26, 201864C$455,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 14, 201863C$6,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 13, 201862C$5,100,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 28, 201861BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 16, 201860C$5,455,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 1, 201759C$9,080,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 9, 201758C$5,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 16, 201757C$2,538,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 2, 201756MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 28, 201755C$550,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 27, 201754C$2,100,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 16, 201753MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 28, 201752BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 21, 201651C$3,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 28, 201650C$250,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 19, 201649B-$20,840.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 8, 201648MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 31, 201646BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 31, 201647C$10,711,900.00Not reportedNot reportedTHE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 29, 201645B$4,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 9, 201644C$1,502,720.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 20, 201643C$761,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 1, 201642C$1,336,055.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 23, 201541C$4,721,293.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 28, 201540C$202,686.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 25, 201539MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 6, 201538C$1,996,400.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 5, 201537C$3,257.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 13, 201536C$6,700,900.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 20, 201535C$12,050,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 14, 201534C$700,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 5, 201533C$2,320,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 5, 201432C$2,910,900.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Oct 24, 201431BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 21, 201430CNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 15, 201429C$400,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 18, 201428C$132,312.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jun 24, 201427C$2,942,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 21, 201426MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 11, 201425C$8,022,360.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 6, 201424C$7,945,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 26, 201423BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 2, 201422C$5,750,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 4, 201321C$5,065,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 9, 201320MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 19, 201319C$6,966,700.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 18, 201318BNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
May 14, 201317C$2,300,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Apr 23, 201316C$4,700,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 26, 201315C$3,485,512.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Feb 6, 201314C$1,302,800.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 19, 201213C$8,522,029.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 17, 201212C$215,531.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 30, 201211C$2,367,843.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 25, 201210C$1,581,016.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Mar 27, 20129C$3,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 27, 20128MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jan 11, 20127C$13,981,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 16, 20116MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Dec 6, 20115C$4,500,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Nov 1, 20114C$3,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Sep 30, 20113MNot reportedNot reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Aug 12, 20112C$1,136,500.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗
Jul 29, 20111C$5,000,000.00Not reportedNot reportedTHE MOSES II EFFORT IS A FIVE-YEAR SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOWLEDGE OF HST S VARIED, COMPLEX, AND UNIQUE FLIGHT AND GROUND SYSTEMS, ENSURING SUCCESSFUL ACCOMPLISHMENT OF THE DIVERSE TASKS NECESSARY TO EFFECTIVELY CONDUCT HST MISSION OPERATIONS AND SYSTEMS ENGINEERING AS WELL AS TO MANAGE AND REPORT CONTRACT ELEMENT COST AND SCHEDULE PERFORMANCE.USAspending ↗