GOVERNMENT CONTRACT / DEFINITIVE CONTRACT
CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RE
Awarded to FIRELAKE CONSTRUCTION INC
$620.6K
Data last updated Oct 22, 2026 · Source: USAspending
- Company legal name
- FIRELAKE CONSTRUCTION INC
- UEI / CAGE
- VNKJEMRCA424 / Not reported
- Parent award
- Not reported
- Awarding agency
- Department of Defense
- Subagency
- Department of the Army
- Industry
- Construction
- NAICS
- 237110
- PSC
- Y1NE
- Performance period
- Not reported — Not reported
- Recipient address
- 1011 E 31ST ST, LAWRENCE, DOUGLAS, KS, 66046
- Place of performance
- LAWRENCE, DOUGLAS, KS, 66049
- Source last modified
- Oct 23, 2026
Description
CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS.
Derived from official transactions
Contract lifecycle
- Award announced
CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RE
Point-in-time model
Contract change outlook
Uncollapsed source history
Transactions and modifications
| Action date | Modification | Action type | Exact obligation | Current total | Potential total | Description | Source |
|---|---|---|---|---|---|---|---|
| Feb 6, 2025 | 0 | Not reported | $620,648.00 | Not reported | Not reported | CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS. | USAspending ↗ |